DESMI Proven Technology 1

DESMI Proven Technology 2

DESMI Proven Technology 3

DESMI Proven Technology 4

DESMI Proven Technology 5


Speed-Sweep

Speed-Sweep

Heavy duty rubber boom recovery system

The DESMI Speed-Sweep System, fully tested at OHMSETT is a heavy duty rubber boom recovery system designed to allow for the collection of oil at greater speeds than has previously been possible. Once the pollutant has been collected at the cusp, a skimmer can be located at the apex and recovery can begin. This can continue while the sweep system is moving forward.

The unique, high efficiency DESMI Speed-Sweep System is designed to either connect to a Ro-Boom system or operate as an independent collection unit. It can be towed either between 2 vessels or 1 vessel with a jib arm or paravane.

The Speed-Sweep can collect oil up to speeds of 3 knots which results in easier and quicker operations all round.

The DESMI Speed-Sweep System is manufactured in the tough Ro-Boom 1500 offshore containment boom, with individual 3 metre buoyancy chambers, tapered down at either end to match RO-BOOM 1300, which is the ideal guide boom for the sweeping system. There are also 3 off 900mm nets, with foam filled circular floats, which are used to interrupt the speed of the oil, allowing it to be collected at the cusp.

The excess water simply escapes through the rear netting. This system allows the surface water and oil to be slowed by as much as 70%, which allows the oil to concentrate in the apex ready for collection. No head wave phenomena or planing will occur.

Technical Specifications:
  • Ro-Boom Material: compound of synthetic rubber with a CSM (Hypalon) external layer
  • Speed-Sweep Front Net Material Kevlar
  • Width (Deflated): Apex 1500mm
  • Guide Booms 1300mm
  • Standard System Length: Sweep 30m
  • Guide Boom 2x16,5m
  • Freeboard: Apex 0.52m, Guide Booms 0.45m
  • Operational depth of skirt: Apex 0.72m, Guide Booms 0.63m
  • Operational weight (incl. Chain): Apex 12kg/m, Guide Booms 9kg/m
  • Buoyancy chamber length: 3m
  • Tensile strength of boom wall: 250N/mm
  • Breaking load of chain: Apex 200kN, Guide Booms 110kN
  • Temperature range: -40°C to + 80°C
  • Section connector: ASTM Slide (Standard)
  • Total Weight on RB1500 winder: 1970 kg
  • Dimensions winder LxWxH: 2194 x 2000 x 2189 mm
  • Weight winder: 780 kg
  • Bollard pull recommended: 2 x 1,5 ton if pulling with 3 knots with a sweep opening of 15 meters

Request a Quote

Videos Brochures Contact


DESMI SPEED SWEEP Deployment and maneuvering with Ro-Kite

Speed-Sweep & Ro-Kite

DESMI RO-KITE Single Vessel SPEED-SWEEP System in Abu Dhabi

DESMI Speed-Sweep Demonstration in Canada

Speed Sweep brochure
Speed Sweep System
EN - RU

Ultimate Speed Sweep System
EN

More Brochures Here

Oil Spill Response Contacts


Related products


To the top

Join DESMI at The Water and Wastewater Fair 2018

The Water and Wastewater Fair (VA-Mässan) is taking place from the 25-27 of September in the Elmia Centre, in Jönköping, Sweden. Locate DESMI at stand no. B03:19.

I’m interested. Tell me more

Join DESMI at Euronaval 2018

The world meeting of naval technologies for the future taking place October 23-26 in Paris Le Bourget, Stand no. E60.

I’m interested. Tell me more

Join DESMI at Ajour 2018

Locate DESMI at the engineers’ business conference, Ajour 2018 the 29-30 of November in Odense Congress Center, Denmark.

I’m interested. Tell me more

Join DESMI at DDAC 2018

The Danish Defence Annual Conference 2018 is taking place 7-8 of November, 2018 in Copenhagen, Denmark.

I’m interested. Tell me more

Join DESMI at the Workboat show 2018

The International Workboat show 2018 is taking place in New Orleans.

I’m interested. Tell me more

Join DESMI at Clean Gulf 2018

The CLEAN GULF Conference & Exhibition focuses on improving oil and hazardous materials spill prevention, preparedness and response for inland, offshore and coastal incidents.

I’m interested. Tell me more

We use cookies to enhance our website and improve your experience of it. If you say no to cookies, our website will still function, but it may result in diminished functionality.

OK