Boom Questionnaire

In order to be able to give you as qualified a service as possible it will be helpful to both yourself and RO-CLEAN DESMI if the below mentioned questionnaire for Boom  Selection is  completed. If the form is filled in it will allow RO-CLEAN DESMI experts to give you the optimum guidance for your purchase of booms.

Please click here to download questionnaire in PDF:

Where will the boom be placed/ deployed?

Offshore

Near shore

River

Harbour/
Jetty

Beach

Onshore

Will the boom be exposed to waves?

Yes

No

 

 

 

If yes, how large the waves?

0 – 0.2 m

0.2 – 0.5 m

0.5 – 1.0 m

1.0 – 2.0 m

>2.0 m

Will the boom be exposed to current?

Yes

No

Direction of current constant?

Yes

No (no means turn of tide)

How strong is the current? (max)

0 – 0.2 m/sec

0.2 – 0.5 m/sec

0.5 – 1.0 m/sec

1.0 – 2.0 m/sec

>2.0 m/sec

Ambient temperature during deployment/

operation (extreme)

Below 0°C

0 – 20°C

20 – 40°C

>40°C

Storage temperature (extreme)

-40° - 0°C

0 – 30°C

30 – 60°C

>60°C

Wind force

0 – 7 m/sec

8 – 12 m/sec

13 – 18 m/ sec

>18 m/sec

Any range of tide?

Yes

No

If yes, how high is the range of tide?

0 – 0.5 m

0.5 – 1.0 m

1.0 – 2.0 m

>2.0 m

What is the water depth?

<1 m

1 – 2 m

2 – 5 m

5 – 10 m

>10 m

How often will the boom be deployed per year?

0 – 2 times

3 – 5 times

5 – 10 times

More than 10 times

How long will the boom be deployed each time?

1 day

2 – 7 days

1 – 4 weeks

More than a month

From where will the boom deployed?

Vessel

Quay

Beach

Various places

What auxiliary equipment is available?

Hydraulics

Electricity

Ship

Other

None

BHP of the vessel?

0 – 50 bhp

50 – 100 bhp

100 – 300 bhp

>300 bhp

Troilboom iin harbour                                  
Closing harbour entrance with Ro-Boom